JEAN-DAIGLE CIVIC CENTRE
Design and construction of a new amphitheatre






Share
Description
Design and construction of a civic centre, located in Edmundston, New Brunswick. Achieved in a design-build formula, the building offers 2400 seats in an ice configuration and 3700 in the show configuration.
The project was completed in 15 months instead of 18 months, despite difficult winter conditions. This high-caliber amphitheatre includes concession-type cooking service as well as scenographic facilities allowing performances to be held. The acoustic performance meets very strict requirements.
The City of Edmundston had a maximum budget of $ 18,650,000 for their project and teamwork was carried out upstream to maximize the performance of the building within the allocated budget.
Project services
- Identification and understanding of the challenges
- Design and coordination with the professionals
- Planning and monitoring of the construction schedule
- Cost control
- Construction and realization of the project
- Coordination and installation of the electromechanical and client equipment
- Management of post-construction guarantees
Client
Ville d'Edmundston
Location
85, rue du 15 août, Edmundston, NB
Year
2017
Budget
$18.6M
Structure
Steel